How long does Tom have to slack?

Fortunately, Tom has 10 days of slack; however, he shares this slack with the hardware installer. He will have to let the contactor know that the hardware will be ready 4 days later than expected and that the slack for the installer has been reduced by 4 days. Tom and the installer share 10 days of. A. Free Slack.

How long does Tom have to install hardware?

Tom is responsible for ordering hardware for a custom home his company is building. The contractor installing the hardware is scheduled to start in 5 working days, but the hardware is on backorder and will not arrive for another 9 working days. Fortunately, Tom has 10 days of slack; however, he shares this slack with the hardware installer.

What do arrows, lines and nodes represent?

E. An arrow, a line and a node all represent activities

When can an activity begin?

A. An activity cannot begin until all preceding activities have been completed

Is activity 1 a predecessor for activity 2?

Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3. If the prototype fails testing, Bill must redesign the prototype; therefore, activity 3 is a predecessor for activity 1. This is an example of. A. Conditional statements.