what is the first course of a retaining wall called

by Jamie Raynor 8 min read

Retaining walls can also consist of stacked layers of gravel or crushed stone. The first course of defence is to stabilize the walls’ top using the slabs as mentioned above. The second course of defence consists of long, horizontal slabs of rock laid directly on top of the gravel or crushed stone.

Foundation. A trench filled with gravel provides a suitable foundation base for a short, step-back retaining wall with three-five courses (each layer of blocks is called a “course”).Dec 28, 2020

Full Answer

Is the first row of a retaining wall level?

Mar 05, 2021 · Retaining walls can also consist of stacked layers of gravel or crushed stone. The first course of defence is to stabilize the walls’ top using the slabs as mentioned above. The second course of defence consists of long, horizontal slabs of rock laid directly on top of the gravel or crushed stone.

Is there such a thing as a step back retaining wall?

Oct 02, 2019 · A "retaining wall" holds back (or "retains") the soil behind it. The pressure behind a tall wall, holding back tons of soil and water, can be enormous; considerable knowledge and experience is needed before undertaking such a project. Even a well-constructed wall would be compromised over time if the builder were to fail to provide a proper ...

How do you build a simple retaining wall?

Dec 28, 2020 · A trench filled with gravel provides a suitable foundation base for a short, step-back retaining wall with three-five courses (each layer of …

What is a retaining wall?

Jan 27, 2022 · The first step is to plan the layout of the walls. Grubbing is Ralston’s term for the process of removing existing vegetation, topsoil, and other material that may be obstructing buildings. The footings must be laid out and dug. The fourth step is to create shapes.

What are the parts of a retaining wall?

A typical retaining wall has four main components: the Stem is the vertical member holding the backfill, the Toe is the portion of the footing at the front of the wall, the Heel is the portion of the footing at the backfill side, and the Shear Key projects down under the footing.

What is retaining wall What is the first step for the design of a retaining wall?

Bored pile retaining walls are built by assembling a sequence of bored piles, followed by excavating away the excess soil. Depending on the project, the bored pile retaining wall may include a series of earth anchors, reinforcing beams, soil improvement operations and shotcrete reinforcement layer.

How do you set a first course on a retaining wall?

0:291:50How to Install a Retaining Wall Base Course - YouTubeYouTubeStart of suggested clipEnd of suggested clipPlace the blocks tight together checking each block for level and alignment from side to side andMorePlace the blocks tight together checking each block for level and alignment from side to side and front to back. Make minor adjustments by tapping the blocks with a dead blow hammer.

What are the steps to retaining a wall?

0:492:11How to Build Steps Using Retaining Wall Units - YouTubeYouTubeStart of suggested clipEnd of suggested clipCover the entire footprint glue all units fill voids and clean debris from the blocks. Place capMoreCover the entire footprint glue all units fill voids and clean debris from the blocks. Place cap units to establish the next tread and glue.

What is semi gravity retaining wall?

Semi gravity retaining wall is a special form of the gravity retaining wall. In this type of retaining wall, a small amount of steel reinforcement is used near the back face in order to minimize the size of wall section.

What are the steps to building a timber retaining wall?

0:416:16Easy DIY Retaining Wall - YouTubeYouTubeStart of suggested clipEnd of suggested clipNow because I'm adding a step I'll need a mix of 75 mil hundred and 125 mill bugle batten screwsMoreNow because I'm adding a step I'll need a mix of 75 mil hundred and 125 mill bugle batten screws brick set concrete at least one bag for each post hole.

How do you lay the first row of a block?

1:3310:51Laying The First Course Of Blocks - YouTubeYouTubeStart of suggested clipEnd of suggested clipJust because it helps the level up a little bit quicker but then you leave those in the next setMoreJust because it helps the level up a little bit quicker but then you leave those in the next set will be staggered on top of these and then you slide them up to where they touch on that.

How do you lay first course of blocks?

Start by dry laying the first course of blocks out to check where they will sit on the footing and whether you will need to cut any blocks to fit. Then move the blocks out of the way and set up a taut string line. This acts as a guide to both the alignment and level of the first course of walling blocks.Jan 28, 2015

Does a 2 foot retaining wall need drainage?

These walls need a drainage system regardless of the wall height. If there are poor draining soils such as clay behind the wall, there needs to be drainage incorporated the wall system. Clay when wet is very weak, so it is essential to provide a way for water to escape from behind the wall.Oct 11, 2020

How do you make steps out of retaining wall blocks?

4:387:04How to build stairs in stone block wall - YouTubeYouTubeStart of suggested clipEnd of suggested clipPlace a small amount of wall rock in front of the blocks for the stair riser to keep them fromMorePlace a small amount of wall rock in front of the blocks for the stair riser to keep them from shifting during compaction fill the hollow cores 12 inches behind the block and the next stair location

How do you build a 2 tier retaining wall?

0:211:52How to Build Independent Terraced Retaining Walls - YouTubeYouTubeStart of suggested clipEnd of suggested clipIn order for these terraced walls to act independently. The upper wall must be built at a distanceMoreIn order for these terraced walls to act independently. The upper wall must be built at a distance away from the lower wall of at least two H.

What materials are used to build retaining walls?

Retaining walls can be constructed using a variety of materials, from poured concrete and large timbers to natural stones, even bricks. For DIY purposes, opt for manufactured blocks that are designed specifically for building retaining walls; a locking flange along the bottom edge creates a secure attachment between rows.

What is the enemy of retaining walls?

Groundwater is the natural enemy of retaining walls. When it saturates clay-type soils, they swell and put excessive pressure on the backside of the wall. To avoid failure, make drainage provisions at the same time as you go about building the retaining wall.

What does a perforated drain pipe do?

The perforated pipe will carry groundwater to each end of the wall where it can drain harmlessly away. The ends of the drainpipe should then exit on each end of the wall, and you may cover them with crushed stone to camouflage their appearance. RELATED: The 10 Best Things You Can Do for Your Soil.

How much soil pressure does a retaining wall need?

Soil is heavy, especially when soaking wet from a recent rainstorm, so a basic retaining wall (four feet tall and 15 feet long) potentially has to support up to 20 tons of soil pressure.

What is DigSafe 811?

While you’re at it, do also place a call DigSafe (811), a nationwide service that will notify local utility companies that you plan to dig. These can determine whether their buried lines will be in the way and mark their exact locations. Advertisement. Photo: istockphoto.com.

What is retaining wall?

Retaining walls have a wide variety of uses around the yard, all of which involve keeping earth from spilling off a steep slope. They’re indispensable in the creation of sunken patios, walkout basements, and any other hardscape with an abrupt separation of ground elevation. You’ll also find retaining walls in parks and public gardens, where they act as retainers for plants, statues, and decorative landscaping elements.

How to keep retaining wall from pushing outward?

They’re also widely available at most home centers. To keep the bottom row of blocks from pushing outward, bury the lowest section of a retaining wall. The general rule of thumb is to bury about one-eighth of the height of the wall.

What is buried footing?

A buried structural footing is usually required for larger retaining walls. To create this, a landscaper pours concrete below frost level (the depth to which the ground will freeze during the winter). Footings poured too shallow are prone to shifting and moving if moisture in the soil freezes and heaves.

How high should I bury a brick wall?

The general rule of thumb is to bury about one-eighth of the height of the wall. For example, if your wall will be three feet (36 inches) tall, the first course of blocks should start five inches below soil level. The gravel base should start three inches below this.

What is gravity wall?

You could also add extra strength with a “gravity wall,” which is so wide that its weight serves as a buttress against the pressure of the soil behind it. This type of wall isn’t common, however, because it requires an extensive amount of stone or concrete for construction.

What is a step back wall?

This design, known as “step-back construction,” creates a sturdy wall structure that pushes back against the lateral pressure of the soil behind it . Step-back walls can be built by anyone with a strong back and basic construction knowledge, as long as they have blocks designed for retaining wall assembly.

How much does a retaining wall cost?

A natural stone or brick retaining wall laid by a mason can cost upwards of $20 per square foot, and a poured concrete retaining wall will set you back $13 to $18 per square foot.

What is segment wall?

Segmental walls are simple in theory but demand planning and precision to do them right. They require that the appropriate amount of wall is buried, the footer is the correct size, and getting the first course level is critical to a successful wall. Always follow the manufacturer’s installation instructions; these are just general guidelines to help you get started. This post is not intended to serve as installation instructions.

How tall is a 24" wall?

To begin your wall, you’ll need to dig down for your footer. For the purposes of explanation let’s say you’re building a 24″ tall wall. The leveling pad (essentially your flexible footer) should be at least 6″ thick. Typical manufacturer instructions say to bury at least 10% of the height of your wall, or no less than 6″ of your wall. So 10% of 24″ is 2.4″, meaning a minimum of 6″ of the wall needs to be below grade. Therefore you’ll dig your footer 12″ down.

What is a retaining wall?

Retaining walls have structural requirements unlike any other landscape walls. Some garden walls aim at providing simple privacy, marking property lines, or keeping in pets and children. These can be built from simple cinderblocks or stacked stone—or they can be simple fences made from wood or vinyl. But a retaining wall must hold back the earth itself, which can exert thousands of pounds of force when saturated with water. The design of a retaining wall must anticipate those stresses. For this reason, the space behind a retaining wall is usually filled not with soil, but with a porous, drainage-promoting material such as gravel or sand. Tall retaining walls may even build in drain tile or other features to shed water and lessen the pressure on the wall.

When is a retaining wall best constructed?

Adjust your material quantities, as needed. A retaining wall is best constructed when the soil is dry after a period of no rain. Wet earth is both hard to shovel into and hard to move.

What material should I use for backfilling a wall?

When the wall reaches its completed height, carefully fill in the space behind the wall using sand or gravel. It is very important to use a porous material for backfill, as it will allow water to easily drain away, lessening the weight and force placed on the wall during heavy rains.

Why is retaining wall so stable?

A retaining wall will be most stable if it is built over a porous base. The porous layer will help with drainage on the completed wall and will also make it easier to level the first row of blocks.

How to cut half blocks?

The half blocks at the end of alternating rows can be cut using a masonry chisel and hammer. Retaining wall blocks have V-notch groove on the backside to allow the blocks to easily cleave in half. Stand the block upright, face down, then position the tip of a broad masonry chisel into the groove.

How to create flat space in front of retaining wall?

To create a flat area in front of the wall, the process involves cutting back, or notching into the slope, then building a retaining wall to hold back the remaining hillside behind the wall.

How much does a retaining wall block weigh?

Some do-it-yourself retaining wall blocks weigh as much as 61 pounds. But it's the blocks' accumulated weight that really does the trick. Our example, a three-tier wall with 14-pound blocks, weighs close to 500 pounds for each 8-foot stretch.

When consecutive courses are stepped back from the face of the wall, what is the purpose of the step back?

You would usually step back the ends of courses successively from bottom to top in an unfinished wall to facilitate the resumption of work or bonding with an intersecting wall.

What is a brick course called?

SOLDIER COURSE. Bricks that are set with the narrow side exposed are called soldiers. Bricks laid vertically with its long narrow sides presented (Soldiers) in a row is called a soldier course. Usually used to add visual interest to a masonry structure.

What is mortar on a brick?

The act of placing mortar on one face of a masonry unit with a trowel before is laid. You will want to put as much mortar as possible on the end of the brick.

What is a bed joint?

The junction of two or more masonry pieces leaving a space between the bricks or concrete masonry units that are filled with mortar or grout. If the joint is parallel to the bed of masonry pieces in a course, it is termed as bed joint. If the joint is perpendicular, then the bed joints are termed vertical joints, side joints, head joints, ...

What is a stretcher course?

STRETCHER COURSE. A course of bricks or stones that lie with its longest side parallel to the face of the work. The course of brickwork in which all the bricks are laid as stretchers is known as stretcher course. In the example below it is a course of bricks four stretchers long.

What is a tie in masonry?

A masonry tie is a wire or sheet metal device used to connect two or more masonry single section brick walls. They are also used to connect masonry veneers to a structural backing system.

What is Flemish bond?

Flemish Bond. An alternate course of bricks that are composed of one header to one stretcher. It can also have several stretches in a row. Many times, the stretcher and headers will be of different color to create patterns.

image